Fachbeiträge

Sämtliche Fachbeiträge aus den Hydrographischen Nachrichten seit der Ausgabe HN 100 sind online verfügbar.
Sie können über Titel, Autor, DOI und Schlüsselwörter gesucht werden.

The challenge of choosing the right method for surveying power cables

The rising number of wind parks, and thus the demand for new survey tasks, results in continuous development for companies working in the renewable energy sector. Building a wind park requires laying inter-array and export cables. Those cables are buried or covered to protect them, bringing environmental changes to a minimum. A common depth of burial ranges from 1.5 m to 3 m. The challenge of surveying those buried power cables is choosing the right method.

cable tracking | depth of burial | HVAC/HVDC | survey power cables

  • Ausgabe: HN 105 Seite: 47–49
  • DOI: 10.23784/HN105-10
  • Autor/en: Oliver Anders

Sorry, this website uses features that your browser doesn’t support. Upgrade to a newer version of Firefox, Chrome, Safari, or Edge and you’ll be all set.

Wir nutzen Cookies auf unserer Website. Einige von ihnen sind essenziell für den Betrieb der Seite, während andere uns helfen, diese Website und die Nutzererfahrung zu verbessern (Tracking Cookies). Sie können selbst entscheiden, ob Sie die Cookies zulassen möchten. Bitte beachten Sie, dass bei einer Ablehnung womöglich nicht mehr alle Funktionalitäten der Seite zur Verfügung stehen.