The challenge of choosing the right method for surveying power cables

The rising number of wind parks, and thus the demand for new survey tasks, results in continuous development for companies working in the renewable energy sector. Building a wind park requires laying inter-array and export cables. Those cables are buried or covered to protect them, bringing environmental changes to a minimum. A common depth of burial ranges from 1.5 m to 3 m. The challenge of surveying those buried power cables is choosing the right method.

cable tracking | depth of burial | HVAC/HVDC | survey power cables

  • Ausgabe: HN 105 Seite: 47–49
  • DOI: 10.23784/HN105-10
  • Autor/en: Oliver Anders